Deployment path
From First Contact to Operating Equipment
Wildcat takes each deployment from the first conversation through site work, installation, and daily operations.
Project flow
Six steps to operating equipment
The path every Wildcat deployment follows.
- 01Project details
- You share the service, platform, load, and target date.
- 02Power and placement
- Wildcat confirms available power and the site for the deployment.
- 03Agreement
- Scope, rate, and term are set in one agreement.
- 04Site preparation
- Wildcat prepares power, racks, cooling, and network.
- 05Installation
- Equipment is received, installed, connected, and started.
- 06Operations
- Wildcat runs the site. OAMP adds daily equipment operations.
Deployment work
The physical work behind each deployment
Site preparation, equipment transport, installation, connection, and operating checks.
Available power
Check available power for your project
Additional power is available at Wildcat's Nebraska sites. Tell us about your deployment and our team will respond with placement options and terms.