Deployment path

From First Contact to Operating Equipment

Wildcat takes each deployment from the first conversation through site work, installation, and daily operations.

Project flow

Six steps to operating equipment

The path every Wildcat deployment follows.

01Project details
You share the service, platform, load, and target date.
02Power and placement
Wildcat confirms available power and the site for the deployment.
03Agreement
Scope, rate, and term are set in one agreement.
04Site preparation
Wildcat prepares power, racks, cooling, and network.
05Installation
Equipment is received, installed, connected, and started.
06Operations
Wildcat runs the site. OAMP adds daily equipment operations.

Available power

Check available power for your project

Additional power is available at Wildcat's Nebraska sites. Tell us about your deployment and our team will respond with placement options and terms.

Check Available Power